Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

대여 장비의 예방정비 일정 결정을 위한 의사 결정 모델 개발

Full metadata record
DC Field Value Language
dc.contributor.author이주현-
dc.contributor.author배기호-
dc.contributor.author안선응-
dc.date.accessioned2021-06-22T12:42:22Z-
dc.date.available2021-06-22T12:42:22Z-
dc.date.issued2018-06-
dc.identifier.issn2005-0461-
dc.identifier.urihttps://scholarworks.bwise.kr/erica/handle/2021.sw.erica/7433-
dc.description.abstractAs a system complexity increases and technology innovation progresses rapidly, leasing the equipment is considered as an important issue in many engineering areas. In practice, many engineering fields lease the equipment because it is an economical way to lease the equipment rather than to own the equipment. In addition, as the maintenance actions for the equipment are costly and need a specialist, the lessor is responsible for the maintenance actions in most leased contract. Hence, the lessor should establish the optimal maintenance strategy to minimize the maintenance cost. This paper proposes two periodic preventive maintenance policies for the leased equipment. The preventive maintenance action of policy 1 is performed with a periodic interval, in which their intervals are the same until the end of lease period. The other policy is to determine the periodic preventive maintenance interval minimizing total maintenance cost during the lease period. In addition, this paper presents two decision-making models to determine the preventive maintenance strategy for leased equipment based on the lessor’s preference between the maintenance cost and the reliability at the end of lease period. The structural properties of the proposed decision-making model are investigated and algorithms to search the optimal maintenance policy that are satisfied by the lessor are provided. A numerical example is provided to illustrate the proposed model. The results show that a maintenance policy minimizing the maintenance cost is selected as a reasonable decision as the lease term becomes shorter. Moreover, the frequent preventive maintenance actions are performed when the minimal repair cost is higher than the preventive maintenance cost, resulting in higher maintenance cost.-
dc.format.extent8-
dc.language한국어-
dc.language.isoKOR-
dc.publisher한국산업경영시스템학회-
dc.title대여 장비의 예방정비 일정 결정을 위한 의사 결정 모델 개발-
dc.title.alternativeDeveloping a Decision-Making Model to Determine the Preventive Maintenance Schedule for the Leased Equipment-
dc.typeArticle-
dc.publisher.location대한민국-
dc.identifier.doi10.11627/jkise.2018.41.2.024-
dc.identifier.bibliographicCitation한국산업경영시스템학회지, v.41, no.2, pp 24 - 31-
dc.citation.title한국산업경영시스템학회지-
dc.citation.volume41-
dc.citation.number2-
dc.citation.startPage24-
dc.citation.endPage31-
dc.identifier.kciidART002359193-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClasskci-
dc.subject.keywordAuthorPreventive Maintenance-
dc.subject.keywordAuthorLeased Equipment-
dc.subject.keywordAuthorMinimal Repair-
dc.subject.keywordAuthorValue function-
dc.identifier.urlhttp://db.koreascholar.com/Article?code=350727-
Files in This Item
Go to Link
Appears in
Collections
COLLEGE OF ENGINEERING SCIENCES > DEPARTMENT OF INDUSTRIAL & MANAGEMENT ENGINEERING > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Altmetrics

Total Views & Downloads

BROWSE