Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

Effects of human errors and trade-credit financing in two-echelon supply chain models

Full metadata record
DC Field Value Language
dc.contributor.authorShin, Dongmin-
dc.contributor.authorMittal, Mandeep-
dc.contributor.authorSarkar, Biswajit-
dc.date.accessioned2021-06-22T13:04:28Z-
dc.date.available2021-06-22T13:04:28Z-
dc.date.created2021-01-21-
dc.date.issued2018-
dc.identifier.issn1751-5254-
dc.identifier.urihttps://scholarworks.bwise.kr/erica/handle/2021.sw.erica/8039-
dc.description.abstractThis paper develops two centralised two-echelon supply chain models with the trade-credit financing and inspection errors. Both models follow a single-setup-multi-delivery (SSMD) policy and each delivery is designed using the just-in-time (JIT) method to increase the efficiency of the supply chain. In first model, the random defective rate is assumed and each delivered item goes through inspection process at the buyer's end due to the contract with vendor, because vendor gives a trade-credit support to buyer. In second model, human errors of Type I and Type II are considered due to tiredness and ignorance of the inspector during inspection process. The joint annual cost of supply chain is minimised with respect to order quantity and number of shipments. Finally, some numerical examples, sensitivity analysis, and graphical representations are given to illustrate more savings from existing literature.-
dc.language영어-
dc.language.isoen-
dc.publisherINDERSCIENCE ENTERPRISES LTD-
dc.titleEffects of human errors and trade-credit financing in two-echelon supply chain models-
dc.typeArticle-
dc.contributor.affiliatedAuthorShin, Dongmin-
dc.identifier.doi10.1504/EJIE.2018.093574-
dc.identifier.scopusid2-s2.0-85051114220-
dc.identifier.wosid000444011200001-
dc.identifier.bibliographicCitationEUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, v.12, no.4, pp.465 - 503-
dc.relation.isPartOfEUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING-
dc.citation.titleEUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING-
dc.citation.volume12-
dc.citation.number4-
dc.citation.startPage465-
dc.citation.endPage503-
dc.type.rimsART-
dc.type.docTypeArticle-
dc.description.journalClass1-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClassscie-
dc.description.journalRegisteredClassscopus-
dc.relation.journalResearchAreaEngineering-
dc.relation.journalResearchAreaOperations Research & Management Science-
dc.relation.journalWebOfScienceCategoryEngineering, Industrial-
dc.relation.journalWebOfScienceCategoryOperations Research & Management Science-
dc.subject.keywordPlusPRODUCTION QUANTITY MODEL-
dc.subject.keywordPlusLOT-SIZE MODEL-
dc.subject.keywordPlusIMPERFECT QUALITY-
dc.subject.keywordPlusINSPECTION ERRORS-
dc.subject.keywordPlusINVENTORY MODEL-
dc.subject.keywordPlusEOQ MODEL-
dc.subject.keywordPlusVENDOR-
dc.subject.keywordPlusPOLICY-
dc.subject.keywordPlusCOST-
dc.subject.keywordPlusPERFORMANCE-
dc.subject.keywordAuthorsupply chain management-
dc.subject.keywordAuthorimperfect items-
dc.subject.keywordAuthorhuman errors-
dc.subject.keywordAuthortrade-credit financing-
dc.identifier.urlhttps://www.inderscienceonline.com/doi/abs/10.1504/EJIE.2018.093574-
Files in This Item
Go to Link
Appears in
Collections
COLLEGE OF ENGINEERING SCIENCES > DEPARTMENT OF INDUSTRIAL & MANAGEMENT ENGINEERING > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Shin, Dong min photo

Shin, Dong min
ERICA 공학대학 (DEPARTMENT OF INDUSTRIAL & MANAGEMENT ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE