Ex-ante Evaluation of Economic Costs from Power Grid Blackout in South Korea
- Authors
- Kim, Chang-Seob; Jo, Manseok; Koo, Yoonmo
- Issue Date
- May-2014
- Publisher
- SPRINGER SINGAPORE PTE LTD
- Keywords
- Electricity; Blackout; Outage; Interruption cost; Contingent valuation method
- Citation
- JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY, v.9, no.3, pp.796 - 802
- Journal Title
- JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY
- Volume
- 9
- Number
- 3
- Start Page
- 796
- End Page
- 802
- URI
- https://scholarworks.bwise.kr/gachon/handle/2020.sw.gachon/12651
- DOI
- 10.5370/JEET.2014.9.3.796
- ISSN
- 1975-0102
- Abstract
- South Korea is recently under serious situation in supplying electricity with enough power reserve. A single fault of power plant at a peak-load time may lead to a total blackout for whole area connected by a single electric grid and isolated from other grids. Despite of the seriousness of blackout, however, there are scarce studies with ex-ante analysis of the economic costs from blackout. In order to evocate the seriousness, we calculate the economic costs for both industrial and household sectors with using some survey data and statistical methodologies. As a result, total economic costs are 39.23 trillion KRW (35.83 trillion KRW for industrial sector, 3.40 trillion KRW for household sector).
- Files in This Item
- There are no files associated with this item.
- Appears in
Collections - IT융합대학 > 에너지IT학과 > 1. Journal Articles
![qrcode](https://api.qrserver.com/v1/create-qr-code/?size=55x55&data=https://scholarworks.bwise.kr/gachon/handle/2020.sw.gachon/12651)
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.