설계변경 재고 소진 최적화: E社 펌프카 아우트리거 공정 중심으로Optimizing the Exhaustion of Inventory for Design Changes: Focusing on Concrete Pump Truck Outrigger Process
- Other Titles
- Optimizing the Exhaustion of Inventory for Design Changes: Focusing on Concrete Pump Truck Outrigger Process
- Authors
- 박찬웅
- Issue Date
- Dec-2022
- Publisher
- 한국산업경영시스템학회
- Keywords
- Exhaustion of Inventory; Design Changes; Concrete Pump Truck
- Citation
- 한국산업경영시스템학회지, v.45, no.4, pp.174 - 179
- Journal Title
- 한국산업경영시스템학회지
- Volume
- 45
- Number
- 4
- Start Page
- 174
- End Page
- 179
- URI
- https://scholarworks.bwise.kr/gachon/handle/2020.sw.gachon/86384
- ISSN
- 2005-0461
- Abstract
- Companies are making design changes by improving product quality and function to succeed while meeting customer requirements continuously. Design changes are changing the product BOM's amount, item, specification, and shape while causing a change in the product's structure. At this time, the problem of inventory exhaustion of parts before design change is a big topic. If the inventory exhaustion fails, the pieces before the design change become unused and are discarded, resulting in a decrease in asset value, and the quality cost of the design change affects the company's profits. Therefore, it is necessary to decide to minimize quality costs while minimizing waste inventory costs at the time of application of design changes. According to the analysis, priorities should be prioritized according to urgency because the quantity of items before the design change affects the applied lead time.
- Files in This Item
- There are no files associated with this item.
- Appears in
Collections - 공과대학 > 산업경영공학과 > 1. Journal Articles
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.