CMS RPC activities during LHC LS-2
- Authors
- Shah, M. A.; El Sawy, M.; Samalan, A.; Tytgat, M.; Zaganidis, N.; Alves, G. A.; Marujo, F.; Torres Silva De Araujo, F.; Da Costa, E. M.; De Jesus Damiao, D.; Nogima, H.; Santoro, A.; Fonseca De Souza, S.; Aleksandrov, A.; Hadjiiska, R.; Iaydjiev, P.; Rodozov, M.; Shopova, M.; Soultanov, G.; Bonchev, M.; Dimitrov, A.; Litov, L.; Pavlov, B.; Petkov, P.; Petrov, A.; Qian, S. J.; Bernal, C.; Cabrera, A.; Fraga, J.; Sarkar, A.; Elsayed, S.; Assran, Y.; Mahmoud, M. A.; Mohammed, Y.; Combaret, C.; Gouzevitch, M.; Grenier, G.; Laktineh, I; Mirabito, L.; Shchablo, K.; Bagaturia, I; Lomidze, D.; Lomidze, I; Bhatnagar, V; Gupta, R.; Kumari, P.; Singh, J.; Amoozegar, V; Boghrati, B.; Ebraimi, M.; Ghasemi, R.; Najafabadi, M. Mohammadi; Zareian, E.; Abbrescia, M.; Aly, R.; Elmetenawee, W.; De Filippis, N.; Franco, M.; Gelmi, A.; Iaselli, G.; Lacalamita, N.; Leszki, S.; Loddo, F.; Margjeka, I; Pugliese, G.; Ramos, D.; Caponero, M.; Benussi, L.; Bianco, S.; Colafranceschi, S.; Russo, A.; Passamonti, L.; Piccolo, D.; Pierluigi, D.; Saviano, G.; Buontempo, S.; Di Crescenzo, A.; Fienga, F.; De Lellis, G.; Lista, L.; Meola, S.; Paolucci, P.; Braghieri, A.; Salvini, P.; Montagna, P.; Riccardi, C.; Vitulo, P.; Francois, B.; Kim, T. J.; Park, J.; Choi, S. Y.; Hong, B.; Lee, K. S.; Goh, J.; Lee, H.; Eysermans, J.; Uribe Estrada, C.; Pedraza, I; Castilla-Valdez, H.; Sanchez-Hernandez, A.; Mondragon Herrera, C. A.; Perez Navarro, D. A.; Ayala Sanchez, G. A.; Carrillo, S.; Vazquez, E.; Radi, A.; Ahmad, A.; Asghar, I; Hoorani, H.; Muhammad, S.; Crotty, I
- Issue Date
- Oct-2020
- Publisher
- IOP PUBLISHING LTD
- Keywords
- Muon spectrometers; Resistive-plate chambers
- Citation
- JOURNAL OF INSTRUMENTATION, v.15, no.10, pp.1 - 7
- Indexed
- SCIE
SCOPUS
- Journal Title
- JOURNAL OF INSTRUMENTATION
- Volume
- 15
- Number
- 10
- Start Page
- 1
- End Page
- 7
- URI
- https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/145074
- DOI
- 10.1088/1748-0221/15/10/C10025
- ISSN
- 1748-0221
- Abstract
- The second LHC long shutdown period (LS2) is an important opportunity for the CMS Resistive Plate Chambers (RPC) to complete their consolidation and upgrade projects. The consolidation includes detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. All services for the RPC Phase-2 upgrade: improved RPC in stations RE3/1 and RE4/1, were anticipated for installation to LS2. This paper summarises the RPC system maintenance and upgrade activities.
- Files in This Item
-
Go to Link
- Appears in
Collections - 서울 자연과학대학 > 서울 물리학과 > 1. Journal Articles

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.