소규모 건축공사의 BIM 정보 활용을 위한 프로세스제안- 철골공사 중심으로 -Process of Using BIM for Small-Scale Construction Projects - Focusing on the Steel-frame Work -
- Other Titles
- Process of Using BIM for Small-Scale Construction Projects - Focusing on the Steel-frame Work -
- Authors
- 김진광; 유무영; 함남혁; 김재준; 최창식
- Issue Date
- Jun-2018
- Publisher
- 한국BIM학회
- Keywords
- 철골공사; BIM; 4D 시뮬레이션; 3D 스캐닝; Steel Structure; BIM; 4D simulation; 3D Scanning
- Citation
- KIBIM Magazine, v.8, no.2, pp 41 - 50
- Pages
- 10
- Indexed
- KCI
- Journal Title
- KIBIM Magazine
- Volume
- 8
- Number
- 2
- Start Page
- 41
- End Page
- 50
- URI
- https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/149875
- DOI
- 10.13161/kibim.2018.8.2.041
- ISSN
- 2288-1697
- Abstract
- The current study focused on the utilization of building information modeling (BIM) data in steel-frame structures, which help to reduce project durations because they employ prefabricated structural members that are assembled on-site. In addition, a business process model was proposed using BIM data collected during the preconstruction, structural steel fabrication, and on-site construction phases of an actual steel-frame project. The ultimate expectation is that BIM data support at each phase, as well as the increased understanding among project participants, will result in an increase in project management productivity. The results from the current study are summarized as follows: To implement a BIM capable of application to steel-frame projects and data utilization, existing theories were studied to develop the construction project steps, both generally into the preconstruction (A1), steel fabrication (A2), and on-site construction phases, (A3) and specifically into 19 BIM-applicable phases. Based on the derived BIM-applicable phases, the model elements of the BIM object were identified, and the shortcomings of existing steel-frame projects were ameliorated, resulting in an improved data flow model. Moreover, for the proposed BIM data flow to progress efficiently, the BIM specialist needs to be well-acquainted with the phase-specific three-dimensional (3D) model output, and the infrastructure to construct an error-free 3D model must be provided. Based on the actual construction example, the BIM data utilized steel-frame projects — via production reports, clash checks, two-dimensional (2D) drawings, four-dimensional (4D) simulations, and 3D scanning — to make cooperation and communication among participants easier.