A two-level method or production planning ana scheduling tor Bi-objective reentrant hybrid flow shops
- Authors
- Cho, Hang-Min; Jeong, In Jae
- Issue Date
- Apr-2017
- Publisher
- Pergamon Press Ltd.
- Keywords
- Bi-objective; Reentrant hybrid flow shop; Genetic algorithm; Delayed customer demand; Hierarchical planning
- Citation
- Computers and Industrial Engineering, v.106, pp 174 - 181
- Pages
- 8
- Indexed
- SCIE
SCOPUS
- Journal Title
- Computers and Industrial Engineering
- Volume
- 106
- Start Page
- 174
- End Page
- 181
- URI
- https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/152591
- DOI
- 10.1016/j.cie.2017.02.010
- ISSN
- 0360-8352
1879-0550
- Abstract
- This research deals with a two-level method of production planning and scheduling problems of the reentrant hybrid flow shops. The hybrid flow shop has serial stages where each stage consists of identical parallel machines. Products can be processed at any one of the parallel machines at a stage in the hybrid flow shop. Also a product may have reentrant operations which require revisits of some stages several times. We consider a two-level hierarchical process on production planning and scheduling of the reentrant hybrid flow shop with the bi-objective function to improve productivity and customer satisfaction. Computational experiments show that the combination of preemptive goal programming based production planning algorithms and Pareto genetic based scheduling algorithms outperforms other two-level algorithms. Also we provide results of the application of the proposed method to both randomly generated problems and a real world Thin Film Transistor and Liquid Crystal Display (TFT-LCD) industry.
- Files in This Item
-
Go to Link
- Appears in
Collections - 서울 공과대학 > 서울 산업공학과 > 1. Journal Articles

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.