Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

Decision Tree based Scheduling for Static and Dynamic Flexible Job Shops with Multiple Process Plans다중 공정계획을 가지는 정적/동적 유연 개별공정에 대한 의사결정 나무 기반 스케줄링

Other Titles
다중 공정계획을 가지는 정적/동적 유연 개별공정에 대한 의사결정 나무 기반 스케줄링
Authors
유재민도형호권용주신정훈김형원남성호이동호
Issue Date
Jan-2015
Publisher
한국정밀공학회
Keywords
Flexible job shop (유연개별공정); Scheduling (일정계획); Multiple process plans (다중 공정계획); Decision tree (의사결정나무)
Citation
한국정밀공학회지, v.32, no.1, pp.25 - 37
Indexed
KCI
Journal Title
한국정밀공학회지
Volume
32
Number
1
Start Page
25
End Page
37
URI
https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/158012
DOI
10.7736/KSPE.2015.32.1.25
ISSN
1225-9071
Abstract
This paper suggests a decision tree based approach for flexible job shop scheduling with multiple process plans. The problem is to determine the operation/machine pairs and the sequence of the jobs assigned to each machine. Two decision tree based scheduling mechanisms are developed for static and dynamic flexible job shops. In the static case, all jobs are given in advance and the decision tree is used to select a priority dispatching rule to process all the jobs. Also, in the dynamic case, the jobs arrive over time and the decision tree, updated regularly, is used to select a priority rule in real-time according to a rescheduling strategy. The two decision tree based mechanisms were applied to a flexible job shop case with reconfigurable manufacturing cells and a conventional job shop, and the results are reported for various system performance measures.
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 산업공학과 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Lee, Dong Ho photo

Lee, Dong Ho
COLLEGE OF ENGINEERING (DEPARTMENT OF INDUSTRIAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE