Intra-day unit commitment for wind farm using model predictive control method
- Authors
- Gui, Yonghao; Kim, Chung Hun; Chung, Chung Choo; Kang, Yong-Cheol
- Issue Date
- Nov-2013
- Keywords
- Centralized control; MPC; unit commitment; wind farm; wind turbine
- Citation
- IEEE Power and Energy Society General Meeting, pp 1 - 5
- Pages
- 5
- Indexed
- SCOPUS
- Journal Title
- IEEE Power and Energy Society General Meeting
- Start Page
- 1
- End Page
- 5
- URI
- https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/161503
- DOI
- 10.1109/PESMG.2013.6672813
- ISSN
- 1944-9925
- Abstract
- This paper presents centralized control for a wind farm using model predictive control (MPC) method. In order to solve intra-day unit commitment (UC) problem, the UC problem is solved by using the MPC method with short-term wind power forecasting. We introduce a new dynamics model for the UC with some constraints to utilize the benefits of the MPC method. The objective function considering the operation and maintenance costs is formulated by adding a new variable in order to average the operating time of each wind turbine (WT) within the whole time. The proposed method could solve the UC problems on-line using the prediction time horizon that could be selected flexibly considering time horizon based on wind power forecasting errors. From the simulation study using 10 WTs, we observed that the proposed dynamics model of UC effectively provided the optimal solution to each scenario. Numerical study will validate that the proposed method can be applied to solving the UC problem of a large scale wind farm by aggregating WTs.
- Files in This Item
-
Go to Link
- Appears in
Collections - 서울 공과대학 > 서울 전기공학전공 > 1. Journal Articles

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.