Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

A multi-stage joint economic lot size model with lead time penalty costs

Full metadata record
DC Field Value Language
dc.contributor.authorKim, Tae bok-
dc.contributor.authorGlock, Christoph H.-
dc.date.accessioned2022-07-16T08:19:32Z-
dc.date.available2022-07-16T08:19:32Z-
dc.date.created2021-05-13-
dc.date.issued2013-09-
dc.identifier.issn0360-8352-
dc.identifier.urihttps://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/161925-
dc.description.abstractThis paper studies the case of a multi-stage supply chain where equal- and unequal-sized batches are transported between the stages and where penalty costs are imposed for long lead times. Unlike earlier works, this paper does not restrict the number of stages to a given value, but rather analyses a general case of the model. First, an analytical model of the supply chain is developed and the properties of the model are discussed. Secondly, a simulation study is conducted to analyse the behaviour of the model. The results of our analysis indicate that the performance of upstream stages of the supply chain is more critical to the performance of the supply chain than the performance of downstream stages. Furthermore, our findings show that a supply chain stage may improve its position significantly by coordinating its behaviour with its direct neighbours in the supply chain.-
dc.language영어-
dc.language.isoen-
dc.publisherPERGAMON-ELSEVIER SCIENCE LTD-
dc.titleA multi-stage joint economic lot size model with lead time penalty costs-
dc.typeArticle-
dc.contributor.affiliatedAuthorKim, Tae bok-
dc.identifier.doi10.1016/j.cie.2013.05.019-
dc.identifier.scopusid2-s2.0-84880545200-
dc.identifier.wosid000324084300013-
dc.identifier.bibliographicCitationComputers and Industrial Engineering, v.66, no.1, pp.133 - 146-
dc.relation.isPartOfComputers and Industrial Engineering-
dc.citation.titleComputers and Industrial Engineering-
dc.citation.volume66-
dc.citation.number1-
dc.citation.startPage133-
dc.citation.endPage146-
dc.type.rimsART-
dc.type.docType정기학술지(Article(Perspective Article포함))-
dc.description.journalClass1-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClassscie-
dc.description.journalRegisteredClassscopus-
dc.relation.journalResearchAreaComputer Science-
dc.relation.journalResearchAreaEngineering-
dc.relation.journalWebOfScienceCategoryComputer Science, Interdisciplinary Applications-
dc.relation.journalWebOfScienceCategoryEngineering, Industrial-
dc.subject.keywordPlusINTEGRATED INVENTORY MODEL-
dc.subject.keywordPlusQUALITY IMPROVEMENT-
dc.subject.keywordPlusONE-VENDOR-
dc.subject.keywordPlusGENERALIZED POLICY-
dc.subject.keywordPlusSETUP REDUCTIONS-
dc.subject.keywordPlusHIPMENT POLICY-
dc.subject.keywordAuthorBatch shipments-
dc.subject.keywordAuthorJoint economic lot size-
dc.subject.keywordAuthorLead time penalty-
dc.subject.keywordAuthorMulti-stage supply chain-
dc.identifier.urlhttps://www.sciencedirect.com/science/article/pii/S0360835213001812?via%3Dihub-
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 산업공학과 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kim, Tae bok photo

Kim, Tae bok
COLLEGE OF ENGINEERING (DEPARTMENT OF INDUSTRIAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE