설계 VE단계에서 발생하는 생산성 저해요소 분석- '00공사 공사 사옥 신축공사' 사례를 중심으로 -A Study on the Hindrance Factors of the Productivity in Design VE Phase

Other Titles
A Study on the Hindrance Factors of the Productivity in Design VE Phase
Authors
최지혜상준김반석김주형김재준
Issue Date
May-2013
Publisher
한국건축시공학회
Keywords
설계VE; 저해요소; 사례조사; design VE; hindrance factor; case study
Citation
한국건축시공학회 학술발표대회 논문집, v.13, no.1, pp.178 - 179
Indexed
OTHER
Journal Title
한국건축시공학회 학술발표대회 논문집
Volume
13
Number
1
Start Page
178
End Page
179
URI
https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/162752
Abstract
After the introduction of the design VE system in 1990s, based on the legal system has made a rapid growth. Also It is evaluated as qualitative growth. Despite this growth, VE effort can cause the occurrence of the risk. In this paper carried out to hindrance factor that decrease the productivity in VE phase for strategy to improve the utilization of basic data.
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 건축공학부 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kim, Jae Jun photo

Kim, Jae Jun
COLLEGE OF ENGINEERING (SCHOOL OF ARCHITECTURAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE