Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

한옥 건설 프로젝트에서의 BIM 도입 활성화를 위한 주요 요인 분석Analysis of significant factors for successful BIM technology application to Korean traditional house projects

Other Titles
Analysis of significant factors for successful BIM technology application to Korean traditional house projects
Authors
장하라이주성서희창오중근김재준
Issue Date
Jan-2013
Publisher
한국건설관리학회
Keywords
Korean Traditional House; Building Information Modeling(BIM); Analytic Hierarchy Process(AHP); Affecting factor; 한옥; 건축 정보 모델링; 계층분석법; 영향요인
Citation
한국건설관리학회 논문집, v.14, no.1, pp 71 - 81
Pages
11
Indexed
KCI
Journal Title
한국건설관리학회 논문집
Volume
14
Number
1
Start Page
71
End Page
81
URI
https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/163601
DOI
10.6106/KJCEM.2013.14.1.071
ISSN
2005-6095
2465-9703
Abstract
최근 한옥의 역사적, 문화적, 친환경적 가치가 재조명되고 아파트로 대변되는 획일화된 주거양식의 대안으로 한옥에 대한 거주 수요 및 관심이 높아지고 있다. 이러한 한옥의 수요 및 관심이 높아짐에 따라서 정부 및 민간에서 한옥의 현대화 및 산업화에 대한 연구가 활발히 추진되고 있다. 한옥의 현대화 및 산업화의 방안으로 BIM적용에 대한 연구가 활발히 진행되고 있고, BIM으로 설계한 한옥 건축의 사례가 증가하고 있다. 한옥은 개별부재를 조립해서 만드는 결구 식 목조건축물이라는 특성과 유지관리가 중요한 측면 때문에 생애주기를 다루는 BIM의 적용 및 활용성이 높다. 그러나 이러한 높은 활용성에 비해 한옥 실무에서의 BIM 도입정도는 매우 저조한 실정이다. 그러므로 본 연구에서는 한옥 건설 프로젝트에서의 BIM 도입 저해요인을 AHP(Analytic Hierarchy Process) 분석기법을 활용한 중요도 분석을 통해서 고찰하고 최종적으로 한옥 건설프로젝트에서 BIM 활용도를 상승시킬 기반자료를 제공하는데 그 목적이 있다.
Recently, Korean Traditional House is being reconsidered as a alternative and eco-friendly residential housing. With these flows, government and industry actively studies the modernization and industrialization of Korean Traditional House. Apply for BIM as a way of modernization and industrialization of Korean Traditional House, research has been actively conducted. Korean Traditional House is building that is assembled by individual Component Therefore it is very useful for modernization of the Korean Traditional House to design Korean Traditional House With BIM. Which is the management technology that produces and distributes information of the architecture. But compared with the effect, the use of BIM is sluggish in the construction. Therefore, In this study after surveying about lowly using BIM on point of AEC(Architect-Engineer-Contract), the result is analyzed with AHP(Analytic Hierarchy Process). So the aim of this study is to offer the base to find the solution of the Affecting factors about lowly using BIM
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 건축공학부 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Altmetrics

Total Views & Downloads

BROWSE