제지 재제조시스템에서의 자원제약을 고려한 로트크기 결정 및 일정계획에 대한 사례연구A Case Study on Capacitated Lot-sizing and Scheduling in a Paper Remanufacturing System
- Other Titles
- A Case Study on Capacitated Lot-sizing and Scheduling in a Paper Remanufacturing System
- Authors
- 김혁철; 도형호; 유재민; 김준규; 이동호
- Issue Date
- Sep-2012
- Publisher
- 한국산업경영시스템학회
- Keywords
- Capacitated Lot-Sizing and Scheduling; Heuristics; Paper Mill; Case Study
- Citation
- 한국산업경영시스템학회지, v.35, no.3, pp.77 - 86
- Indexed
- KCI
- Journal Title
- 한국산업경영시스템학회지
- Volume
- 35
- Number
- 3
- Start Page
- 77
- End Page
- 86
- URI
- https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/164689
- ISSN
- 2005-0461
- Abstract
- We consider the capacitated lot-sizing and scheduling problem for a paper remanufacturing system that produces several types of corrugated cardboards. The problem is to determine the lot sizes as well as the sequence of lots for the objective of minimizing the sum of setup and inventory holding costs while satisfying the demand and the machine capacity over a given planning horizon.
In particular, the paper remanufacturing system has sequence-dependent setup costs that depend on the type of product just completed and on the product to be processed. Also, the setup state at one period can be carried over to the next period. An integer programming model is presented to describe the problem. Due to the complexity of the problem, we modify the existing two-stage heuristics in which an initial solution is obtained and then it is improved using a multi-pass interchange method. To show the performances of the heuristics, computational experiments were done using the real data, and a significant amount of improvement is reported.
- Files in This Item
-
Go to Link
- Appears in
Collections - 서울 공과대학 > 서울 산업공학과 > 1. Journal Articles
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.