설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project

Other Titles
Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project
Authors
류혁준박병주유승규김주형김재준
Issue Date
May-2012
Publisher
한국건축시공학회
Keywords
설계시공일괄입찰공사; 설계변경; 클레임; design-build; change order; claim
Citation
한국건축시공학회 학술발표대회 논문집, v.12, no.1, pp.129 - 130
Indexed
OTHER
Journal Title
한국건축시공학회 학술발표대회 논문집
Volume
12
Number
1
Start Page
129
End Page
130
URI
https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/165518
Abstract
Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary’s claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 건축공학부 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kim, Ju Hyung photo

Kim, Ju Hyung
COLLEGE OF ENGINEERING (SCHOOL OF ARCHITECTURAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE