설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project
- Other Titles
- Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project
- Authors
- 류혁준; 박병주; 유승규; 김주형; 김재준
- Issue Date
- May-2012
- Publisher
- 한국건축시공학회
- Keywords
- 설계시공일괄입찰공사; 설계변경; 클레임; design-build; change order; claim
- Citation
- 한국건축시공학회 학술발표대회 논문집, v.12, no.1, pp.129 - 130
- Indexed
- OTHER
- Journal Title
- 한국건축시공학회 학술발표대회 논문집
- Volume
- 12
- Number
- 1
- Start Page
- 129
- End Page
- 130
- URI
- https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/165518
- Abstract
- Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary’s claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.