Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

철골골조 공사의 공기 및 비용절감을 위한 실시간 진도관리 시스템 제안A Study on the Model of Real-Time Progress System for reduction period and cost in steel construction

Other Titles
A Study on the Model of Real-Time Progress System for reduction period and cost in steel construction
Authors
김성식박정로김주형김재준
Issue Date
Feb-2012
Publisher
한국CDE학회
Keywords
RTPM(Real-Time Progress Management); RCA’s Structural Steel Work; Steel Construction
Citation
2012 한국 CAD/CAM 학회 학술발표회 논문집, no. , pp.654 - 658
Indexed
OTHER
Journal Title
2012 한국 CAD/CAM 학회 학술발표회 논문집
Start Page
654
End Page
658
URI
https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/166221
Abstract
According to increase in the accumulation of capital and technology, Today"s construction industry continuously larger buildings, high-rise steel-frame construction. In this construction steel, reasonable process for the planning and management is having a significant impact on business success. In this study, 3D-CAD Database of information built into the shape of all the absence of information, location information, work orders, scheduled work hours, real-time and automatically generated and linked to real-time progress Database Management System (RTPM) course of action using the existing steel framing, and RCA methoud of construction compared with the steel frame work processes that will attempt to demonstrate the productivity and efficiency.
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 건축공학부 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kim, Jae Jun photo

Kim, Jae Jun
COLLEGE OF ENGINEERING (SCHOOL OF ARCHITECTURAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE