Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

공동주택의 공사기간 산정의 문제점 분석Problem Analysis for Estimating of Construction Duration of Apartment Building

Other Titles
Problem Analysis for Estimating of Construction Duration of Apartment Building
Authors
임정민권민지김주형김재준
Issue Date
Apr-2011
Publisher
대한건축학회
Keywords
공동주택; 공사기간; 이토 산정식; Construction Duration; Apartment Buidling; calculation method
Citation
대한건축학회 춘계학술발표대회논문집 구조계, v.31, no.1, pp.163 - 164
Indexed
OTHER
Journal Title
대한건축학회 춘계학술발표대회논문집 구조계
Volume
31
Number
1
Start Page
163
End Page
164
URI
https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/168609
ISSN
2092-7827
Abstract
Recently, Interest in calculations on period of building construction is increasing, as building construction is to be bigger, complex, diversified. Building construction has many cases which sign a contract including period of construction calculated on basic stage. And a calculation on proper construction period is important at this time. Most of calculations on construction based on the person's experience and subjective judgment differ from practical construction period. That's why we need a proper construction period to minimize the problems and errors on basic planning stage. This thesis shows standards on calculation method of construction period used in Korea by analyzing a existing study to figure out a proper construction period.
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 건축공학부 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kim, Jae Jun photo

Kim, Jae Jun
COLLEGE OF ENGINEERING (SCHOOL OF ARCHITECTURAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE