Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

대기행렬을 활용한 최적의 자원 할당 의사 결정 방법 제안 연구A Study on the Proposal of Optimal Resource Allocation Decision-Making Method Using Queueing Model

Other Titles
A Study on the Proposal of Optimal Resource Allocation Decision-Making Method Using Queueing Model
Authors
오정인위경수노석호김재준
Issue Date
Sep-2022
Publisher
대한건축학회
Keywords
Large-scale Apartment; Resource Allocation; Foundation Work; Queueing Model; Decision Making Method; 5D; 대규모 공동주택; 자원 할당; 기초공사; 대기행렬 모형; 의사 결정 방법; 5D
Citation
대한건축학회논문집, v.38, no.9, pp 297 - 307
Pages
11
Indexed
SCOPUS
KCI
Journal Title
대한건축학회논문집
Volume
38
Number
9
Start Page
297
End Page
307
URI
https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/173123
DOI
10.5659/JAIK.2022.38.9.297
ISSN
2733-6239
2733-6247
Abstract
본 연구의 목적은 대기행렬을 이용하여 최적의 결정방법을 제안함으로써 시공관리자가 시공계획하는데 의사결정을 돕는 것이다. 자원 관리는 건설의 성공을 결정할 수 있다. 자원 관리를 위해 많은 연구가 제안되었지만 객관적, 정량적으로 평가되지는 않았다. 본 논문에서는 최적의 자원배분 의사결정 방법을 통해 생산성 평가에 따라 재설계될 공정계획을 분석한다. 첫째, 사례 프로젝트 및 대기 행렬 모델 분석. 둘째, 자원 할당 후 경제 분석을 통해 최적의 서버 수를 결정한다. 셋째, BIM에 날짜와 수량을 입력하여 최선의 의사결정 방법을 제안한다. 제안 방식을 통해 기존 요금제 대비 22.6%(2,474만원)를 절감할 수 있었다. 공정계획의 생산성은 객관적이고 정량적으로 평가될 수 있다. 결과적으로, 대기행렬 모델을 이용한 최적의 의사결정 방법은 생산성 평가를 기반으로 공정 계획을 재설계하여 비용을 절감하고 건설 관리자가 의사 결정을 내리는 데 도움이 될 수 있다.
The purpose of this study is to help the construction manager make decisions in progressing the construction plan by proposing the optimal decision method using the Queueing Model. Resource management can determine the success of construction. Many studies have been proposed for resource management, but have not been evaluated objectively and quantitatively. In this paper, we analyze the process plan to be redesigned according to the productivity evaluation through the optimal resource allocation decision- making method. First, analysis of case projects and queuing models. Second, the optimal number of servers is determined through economic analysis after resource allocation. Third, enter the date and quantity in the BIM to suggest the best decision method. Through the proposed method, 22.6% (24.74 million won) could be saved compared to the existing plan. The productivity of the process plan could be evaluated objectively and quantitatively. As a result, the optimal decision-making method using queueing model can help reduce costs and help construction managers make decisions by redesigning process plans based on productivity assessments.
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 건축공학부 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Altmetrics

Total Views & Downloads

BROWSE