A study on development of real time monitoring system for field integrated management - Overall automation of steel construction
- Authors
- Hyun, Tae J; Chi, Su Son; Kyung, Hun Kim; Kim, Kyung Hwan; Kim, Jae Jun
- Issue Date
- Oct-2007
- Publisher
- ICCAS
- Keywords
- Automatic creation of schedule; CAD model; Database; Real time management monitoring system; RFID
- Citation
- ICCAS 2007 - International Conference on Control, Automation and Systems, pp.1937 - 1941
- Indexed
- SCOPUS
- Journal Title
- ICCAS 2007 - International Conference on Control, Automation and Systems
- Start Page
- 1937
- End Page
- 1941
- URI
- https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/179456
- DOI
- 10.1109/ICCAS.2007.4406665
- ISSN
- 0000-0000
- Abstract
- Recently, Construction industry is mainly consisted with construction project that have become bigger, higher and construction industry is positively demanded with productivity security, competitive power improvement and so on. At these demand in construction industry, Organic management system is essential with Each field of project for big construction project. Construction industry demands an information-oriented tool of construction at construction industry that didn't smoothly progress Stream of generated various information at existing construction project for Organic management. Especially, Construction work management side is focused through using an information-oriented tool of construction and using visualized information is demanded for that. CAD among those is tried to use coordination environment tool that coordinate various work process, not just drawings tool. 4D model that is connected with schedule information by using 3D model information is utilized for many project. This paper will discuss how 4D model is connected with RFTD system that can get real time information for introducing real time progress management monitoring system at steel construction. And the paper introduces the how can use schedule information that is connected with real time input information. Last, The way of real time monitoring system that monitor construction information by using automated creation schedule information, 4D system and RFID system will be introduced.
- Files in This Item
-
Go to Link
- Appears in
Collections - 서울 공과대학 > 서울 건축공학부 > 1. Journal Articles
![qrcode](https://api.qrserver.com/v1/create-qr-code/?size=55x55&data=https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/179456)
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.