Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality

Authors
Kim, Hwa-JoongLee, Dong HoXirouchakis, Paul C.
Issue Date
Jan-2006
Publisher
TAYLOR & FRANCIS LTD
Keywords
heuristic; production planning; disassembly; environmental studies
Citation
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.44, no.1, pp.195 - 212
Indexed
SCIE
SCOPUS
Journal Title
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume
44
Number
1
Start Page
195
End Page
212
URI
https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/181846
DOI
10.1080/00207540500244443
ISSN
0020-7543
Abstract
Disassembly scheduling is one of the important planning problems in disassembly systems, and generally defined as the problem of determining the quantity and timing of disassembling products in order to satisfy the demand of their parts or components over a planning horizon. This paper focuses on the case of multiple product types with parts commonality for the objective of minimizing the sum of set-up, disassembly operation and inventory-holding costs, and it suggests a two-phase heuristic in which an initial solution is obtained using a linear-programming relaxation, and then improved by perturbing the initial solution using a dynamic programming algorithm with look-ahead check. Computational experiments are done on a number of randomly generated test problems and the results show that the heuristic suggested in this paper can give near-optimal solutions within a short computation time.
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 산업공학과 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Lee, Dong Ho photo

Lee, Dong Ho
COLLEGE OF ENGINEERING (DEPARTMENT OF INDUSTRIAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE