Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

Due-date based scheduling for remanufacturing systems with parallel disassembly, job-shop-type reprocessing and parallel reassembly workstations

Authors
이동호
Issue Date
28-Apr-2017
URI
https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/32682
Place
여수 엑스포 컨벤션센터
Conference Name
2017 대한산업공학회 한국경영과학회 한국시뮬레이션학회 춘계 공동학술대회
Files in This Item
There are no files associated with this item.
Appears in
Collections
서울 공과대학 > 서울 산업공학과 > 2. Conference Papers

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Lee, Dong Ho photo

Lee, Dong Ho
COLLEGE OF ENGINEERING (DEPARTMENT OF INDUSTRIAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE