수요 예측 평가를 위한 가중절대누적오차지표의 개발A New Metric for Evaluation of Forecasting Methods : Weighted Absolute and Cumulative Forecast Error

Other Titles
A New Metric for Evaluation of Forecasting Methods : Weighted Absolute and Cumulative Forecast Error
Authors
최대일옥창수
Issue Date
2015
Publisher
한국산업경영시스템학회
Keywords
Forecasting Error; Aggregate Planning; Weighted Absolute and Cumulative Forecasting Error
Citation
한국산업경영시스템학회지, v.38, no.3, pp.159 - 168
Journal Title
한국산업경영시스템학회지
Volume
38
Number
3
Start Page
159
End Page
168
URI
https://scholarworks.bwise.kr/hongik/handle/2020.sw.hongik/10661
ISSN
2005-0461
Abstract
Aggregate Production Planning determines levels of production, human resources, inventory to maximize company’s profits and fulfill customer's demands based on demand forecasts. Since performance of aggregate production planning heavily depends on accuracy of given forecasting demands, choosing an accurate forecasting method should be antecedent for achieving a good aggregate production planning. Generally, typical forecasting error metrics such as MSE (Mean Squared Error), MAD (Mean Absolute Deviation), MAPE (Mean Absolute Percentage Error), and CFE (Cumulated Forecast Error) are utilized to choose a proper forecasting method for an aggregate production planning. However, these metrics are designed only to measure a difference between real and forecast demands and they are not able to consider any results such as increasing cost or decreasing profit caused by forecasting error. Consequently, the traditional metrics fail to give enough explanation to select a good forecasting method in aggregate production planning. To overcome this limitation of typical metrics for forecasting method this study suggests a new metric, WACFE (Weighted Absolute and Cumulative Forecast Error), to evaluate forecasting methods. Basically, the WACFE is designed to consider not only forecasting errors but also costs which the errors might cause in for Aggregate Production Planning. The WACFE is a product sum of cumulative forecasting error and weight factors for backorder and inventory costs. We demonstrate the effectiveness of the proposed metric by conducting intensive experiments with demand data sets from M3-competition. Finally, we showed that the WACFE provides a higher correlation with the total cost than other metrics and, consequently, is a better performance in selection of forecasting methods for aggregate production planning.
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > Industrial Engineering Major > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Ok, Chang Soo photo

Ok, Chang Soo
Engineering (Department of Industrial and Data Engineering)
Read more

Altmetrics

Total Views & Downloads

BROWSE