On UFR settings considering wind power fluctuation in Jeju Island
- Authors
- Park, M.-S.; Chun, Y.-H.; Byun, S.-H.; Yang, J.-J.
- Issue Date
- 2014
- Publisher
- Korean Institute of Electrical Engineers
- Keywords
- HVDC; Jeju; Load shedding; UFR; Wind power
- Citation
- Transactions of the Korean Institute of Electrical Engineers, v.63, no.4, pp.445 - 450
- Journal Title
- Transactions of the Korean Institute of Electrical Engineers
- Volume
- 63
- Number
- 4
- Start Page
- 445
- End Page
- 450
- URI
- https://scholarworks.bwise.kr/hongik/handle/2020.sw.hongik/16420
- DOI
- 10.5370/KIEE.2014.63.4.445
- ISSN
- 1975-8359
- Abstract
- Jeju power system is connected to the mainland power system through HVDC, and receives about half of required electricity through the HVDC lines. Jeju power system already experienced black out when a generator tripped at the moment of the HVDC line faults. But, UFR operated as was expected when HVDC line fault occurred at that time. As the penetration level of wind turbines increases, it is required to set UFR again considering intermittent wind turbin outputs. In this paper, we address a new way of UFR setting through computer simulation.
- Files in This Item
- There are no files associated with this item.
- Appears in
Collections - College of Engineering > School of Electronic & Electrical Engineering > 1. Journal Articles
![qrcode](https://api.qrserver.com/v1/create-qr-code/?size=55x55&data=https://scholarworks.bwise.kr/hongik/handle/2020.sw.hongik/16420)
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.