비용기반 전력시장에서의 용량요금 산정방안에 관한 연구A Study on the Capacity Payment in Cost Based Pool
- Other Titles
- A Study on the Capacity Payment in Cost Based Pool
- Authors
- 한석만; 김발호
- Issue Date
- 2008
- Publisher
- 대한전기학회
- Keywords
- Capacity Payment; Reliability Pricing Model; Cost Based Pool
- Citation
- 전기학회논문지ABCD, v.57, no.9, pp.1531 - 1535
- Journal Title
- 전기학회논문지ABCD
- Volume
- 57
- Number
- 9
- Start Page
- 1531
- End Page
- 1535
- URI
- https://scholarworks.bwise.kr/hongik/handle/2020.sw.hongik/23010
- ISSN
- 1229-2443
- Abstract
- In the past vertically integrated power system, the power utility forecasted power demand and invested new power plants to keep a system adequacy. However, in the competitive electricity markets, a principle part of the capacity investment is market participants who decided the investment to maximize their profit. Especially, one of the main factors in their long-term decision making is the retrieval of fixed costs (construction costs). This paper presents the capacity payment in electricity power markets. The capacity payment (CP) in Cost Based Pool (CBP) is needed to recover fixed costs. However, CP in CBP was applied not only recovering fixed costs but also ensuring supply reliability. In order to operate harmonious power markets, pool needs reasonable CP mechanism. This paper analysis CP using capacity proportion and Reliability Pricing Model (RPM).
- Files in This Item
- There are no files associated with this item.
- Appears in
Collections - College of Engineering > School of Electronic & Electrical Engineering > 1. Journal Articles
![qrcode](https://api.qrserver.com/v1/create-qr-code/?size=55x55&data=https://scholarworks.bwise.kr/hongik/handle/2020.sw.hongik/23010)
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.