Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

비용기반 전력시장에서의 용량요금 산정방안에 관한 연구A Study on the Capacity Payment in Cost Based Pool

Other Titles
A Study on the Capacity Payment in Cost Based Pool
Authors
한석만김발호
Issue Date
2008
Publisher
대한전기학회
Keywords
Capacity Payment; Reliability Pricing Model; Cost Based Pool
Citation
전기학회논문지ABCD, v.57, no.9, pp.1531 - 1535
Journal Title
전기학회논문지ABCD
Volume
57
Number
9
Start Page
1531
End Page
1535
URI
https://scholarworks.bwise.kr/hongik/handle/2020.sw.hongik/23010
ISSN
1229-2443
Abstract
In the past vertically integrated power system, the power utility forecasted power demand and invested new power plants to keep a system adequacy. However, in the competitive electricity markets, a principle part of the capacity investment is market participants who decided the investment to maximize their profit. Especially, one of the main factors in their long-term decision making is the retrieval of fixed costs (construction costs). This paper presents the capacity payment in electricity power markets. The capacity payment (CP) in Cost Based Pool (CBP) is needed to recover fixed costs. However, CP in CBP was applied not only recovering fixed costs but also ensuring supply reliability. In order to operate harmonious power markets, pool needs reasonable CP mechanism. This paper analysis CP using capacity proportion and Reliability Pricing Model (RPM).
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > School of Electronic & Electrical Engineering > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kim, Bal ho photo

Kim, Bal ho
Engineering (Electronic & Electrical Engineering)
Read more

Altmetrics

Total Views & Downloads

BROWSE