Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

미국 내 다중 간격 실시간 시장 운영 및 가격 결정 방식 분석Analysis of Multi-Interval Real Time Market Operations and Pricing Methods in the United States

Other Titles
Analysis of Multi-Interval Real Time Market Operations and Pricing Methods in the United States
Authors
신훈영박상준
Issue Date
2022
Publisher
대한전기학회
Keywords
Electricity markets; Look-ahead dispatch; Multi-interval real time market; Flexible ramping product
Citation
전기학회논문지, v.71, no.5, pp 691 - 699
Pages
9
Journal Title
전기학회논문지
Volume
71
Number
5
Start Page
691
End Page
699
URI
https://scholarworks.bwise.kr/hongik/handle/2020.sw.hongik/32966
ISSN
1975-8359
2287-4364
Abstract
With the increase of renewable energy in the power system, the volatility of net load and uncertainty in the power system continue to increase. This can increase the number of ramp events and supply and demand imbalances in the power system, which can lead to abnormal and inefficient operations such as price instability and price spikes in the power market. Accordingly, securing ramping capability to strengthen flexibility is becoming important. In this paper, we will look at the markets introduced by ISO, especially CAISO and NYISO in the United States to secure ramping up/down resources. MIRTM(multi-interval real time market) is a market based on real time unit commitment and look-ahead dispatch considering continuous time. MIRTM operation can reflect the volatility of the net load in economic dispatch, but there is a limit to reflecting shortterm uncertainty of net load, and there is an issue related to the uplift in determining electricity prices. It is analyzed that these limitations of MIRTM can be partially supplemented through the FRP(flexible ramping product) introduced by CAISO. The FRP is a product that ensures a 95% confidence interval for net load forecasting error in economic dispatch. Through FRP, pure energy prices and ramping related costs can be distinguished in MIRTM, and and it is analyzed that FRP can be a reasonable decision method to calculate the uplift in MIRTM.
Files in This Item
There are no files associated with this item.
Appears in
Collections
ETC > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Hunyoung, Shin photo

Hunyoung, Shin
Engineering (Electronic & Electrical Engineering)
Read more

Altmetrics

Total Views & Downloads

BROWSE