Continuous Commissioning의 절차와 적용Continuous Commissioning Process and Application
- Other Titles
- Continuous Commissioning Process and Application
- Authors
- 조영흠
- Issue Date
- May-2010
- Publisher
- 한국태양에너지학회
- Keywords
- 건물 커미셔닝; 시스템 최적화; 에너지 절감; Continuous Commissioning; System Optimization; Energy Savings
- Citation
- 한국태양에너지학회 논문집, v.30, no.5, pp 77 - 84
- Pages
- 8
- Journal Title
- 한국태양에너지학회 논문집
- Volume
- 30
- Number
- 5
- Start Page
- 77
- End Page
- 84
- URI
- https://scholarworks.bwise.kr/kumoh/handle/2020.sw.kumoh/27895
- ISSN
- 1598-6411
- Abstract
- This paper presents the continuous commissioning process, information on the case study facility, improved system operation, and building energy consumption measures before and after continuous commissioning implementation. Continuous commissioning is an ongoing process to resolve operating problems, improve comfort, optimize energy use and identify retrofits for existing commercial and institutional buildings and central plant facilities. Continuous commissioning process consists of two phases. The first phase is the project development phase and the second phase implements and verifies project performance. Results of a case study show that continuous commissioning implementation can reduce energy costs. The energy reports show the electricity savings of 22% and gas savings of 47% on an average.
- Files in This Item
- There are no files associated with this item.
- Appears in
Collections - ETC > 1. Journal Articles
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.