공랭식 가스터빈 발전기의 운전중 부분방전 분석
- Authors
- 이은춘; 공태식; 김재철; 김희동
- Issue Date
- 2014
- Publisher
- 한국조명.전기설비학회
- Keywords
- On-Line; Partial Discharge; Generator; Stator Windings; TGA
- Citation
- 조명.전기설비학회논문지, v.28, no.7, pp.41 - 47
- Journal Title
- 조명.전기설비학회논문지
- Volume
- 28
- Number
- 7
- Start Page
- 41
- End Page
- 47
- URI
- http://scholarworks.bwise.kr/ssu/handle/2018.sw.ssu/10618
- ISSN
- 1229-4691
- Abstract
- The on-line partial discharge (PD) in stator windings of air-cooled gas turbine (GT) generator (119.2MVA, 13.8kV) is measured and analyzed in this paper. This generator was designed by global vacuum pressure impregnation (VPI). The generator failed two times at top bar (16T) of phase B in the stator slot. Six epoxy-mica capacitors were installed in three phases of GT generator. On-line PD test was performed on GT generator using turbine generator analyzer (TGA). TGA showed that the normalized quantity number (NQN) and the PD magnitude(Qm) were high in phase B. Internal discharges were generated in phases A, B and C. The trend analysis of NQN and Qm value are obtained in order to monitor the insulation condition in GT generator stator windings. Phases A and C were in good condition. But phase B had deteriorated significantly.
- Files in This Item
- There are no files associated with this item.
- Appears in
Collections - College of Engineering > School of Electrical Engineering > 1. Journal Articles
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.