Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

배전계통에 초전도 전류제한기 적용 시 Relcoser-Fuse 협조 방법에 관한 연구

Authors
김명후김진석유일경문종필임성훈김재철
Issue Date
2009
Publisher
대한전기학회
Keywords
Recloser-Fuse coordination; Superconducting fault current limiter; Fuse rating; Power distribution system; Recloser-Fuse coordination; Superconducting fault current limiter; Fuse rating; Power distribution system
Citation
전기학회논문지ABCD, v.58, no.10, pp.1835 - 1841
Journal Title
전기학회논문지ABCD
Volume
58
Number
10
Start Page
1835
End Page
1841
URI
http://scholarworks.bwise.kr/ssu/handle/2018.sw.ssu/16058
ISSN
1229-2443
Abstract
We analyze the problem of recloser-fuse coordination when a superconducting fault current limiter (SFCL) is installed to a power distribution system. Generally, The recloser is installed to upstream of fuse to protect against both permanent fault and temporary one appropriately. However, in a power distribution system with SFCL, the fault current is decreased by the effect of the impedance value of the SFCL and when a permanent fault occurs, the fuse may not melt during the last delay operation of the recloser because of the insufficient heat from the decreased current. Therefore, when SFCLs are applied into a power distribution system, the rating of the fuse has to be reselected to coordinate recloser to fuse effectively. To solve these problems, this paper analysed the operation of recloser-fuse coordination and presented the improved recloser-fuse coordination method in a power distribution system with SFCL using PSCAD/EMTDC.
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > School of Electrical Engineering > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kim, Jae Chul photo

Kim, Jae Chul
College of Engineering (School of Electrical Engineering)
Read more

Altmetrics

Total Views & Downloads

BROWSE