Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

교통용량 개정에 따른 고속도로 공사구간의 서비스 수준에 대한 연구

Authors
Ryu, Sung WooPark, Kwon-JeaHan, Seung HwanCho, Yoon-Ho
Issue Date
Jun-2014
Publisher
한국도로학회
Keywords
capacity manual; pavement rehabilitation; sensitive analysis; calendar for lane closure
Citation
한국도로학회논문집, v.16, no.3, pp 109 - 117
Pages
9
Journal Title
한국도로학회논문집
Volume
16
Number
3
Start Page
109
End Page
117
URI
https://scholarworks.bwise.kr/cau/handle/2019.sw.cau/13422
DOI
10.7855/IJHE.2014.16.3.109
ISSN
1738-7159
2287-3678
Abstract
PURPOSES: This study analyzes the available working time at work-zone on the Expressway in accordance to the new capacity manual. METHODS: Sensitivity analysis on variables were conducted to calculate the adjusted capacity at work-zone based on previous researches. RESULTS : The main factors which affect available working time at the work-zone were its capacity, number of lanes, terrain and lanewidth. Other factors have minimal effect on the available working time. Based on the analysis, a calendar of lane closures was suggested. CONCLUSIONS : A series of studies concluded that the capacity at work-zone in the new capacity manual reduced to 76-82% of theexisting manual. As such, the available working time decreased. Furthermore, the factors affecting the available working time needs to beconsidered when making a plan to rehabilitate the distressed pavement.
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > ETC > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Cho, Yoon-Ho photo

Cho, Yoon-Ho
공과대학 (건설환경플랜트공학)
Read more

Altmetrics

Total Views & Downloads

BROWSE