Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

재개발·재건축사업의 원가분석 및 수익성 개선방안에 관한 사례연구A Case Study on the Cost Analysis and Profit Improvement Scheme of Redevelopment ․ Reconstruction Projects

Authors
전용권유진호김용수
Issue Date
2004
Publisher
대한건축학회
Keywords
Redevelopment; Reconstruction; Profit; 재개발; 재건축; 수익성; Redevelopment; Reconstruction; Profit
Citation
대한건축학회논문집 구조계, v.20, no.12, pp 101 - 108
Pages
8
Journal Title
대한건축학회논문집 구조계
Volume
20
Number
12
Start Page
101
End Page
108
URI
https://scholarworks.bwise.kr/cau/handle/2019.sw.cau/35820
ISSN
1226-9107
Abstract
The purposes of this study are to analyze major cost factors and to suggest profit improvement scheme for redevelopment·reconstruction projects. The methods of this study includes cases studies and questionnaire survey for redevelopment·reconstruction projects of the `D' construction company. The results of this study are as follows; 1) in the redevelopment·reconstruction projects, critical cost management items are analyzed to be head office expense, internal bank interest rate, hiring cost of heavy equipments, and so on. 2) the major risk factors are analyzed to be unsold houses and uncollected amount, and 3) suggested profit improvement scheme includes to reduce headquarter's operating expense and interest rate.
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > School of Architecture and Building Science > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Altmetrics

Total Views & Downloads

BROWSE