Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

공동주택의 부위별 수선비 및 장기수선충당금 분석A Study on the Long-Term Maintenance Costs and Elemental Maintenance Costs for Apartment Buildings

Authors
강현욱원유만김용수
Issue Date
2010
Publisher
대한건축학회
Keywords
Apartment Building; Life Cycle Cost; Elemental Maintenance Costs; Long-Term Maintenance Costs; 공동주택; 생애주기비용; 부위별 수선비; 장기수선충당금
Citation
대한건축학회논문집 구조계, v.26, no.11, pp 111 - 118
Pages
8
Journal Title
대한건축학회논문집 구조계
Volume
26
Number
11
Start Page
111
End Page
118
URI
https://scholarworks.bwise.kr/cau/handle/2019.sw.cau/36177
ISSN
1226-9107
Abstract
The purpose of this study is to long-term maintenance cost and elemental maintenance cost analysis for apartment buildings. The adapted research method of apartment building complex located in Gyeonggi-Do that had completed developmental process and under construction has selected as a case study for this research, the classification system was established. Such facility classification system was applied to the statement of construction cost using Net Present Value method (NPV) for elemental maintenance cost analysis. And deviation between annual accumulated long-term maintenance cost and annual expense of maintenance cost was compared based on the result of analyzed elemental maintenance cost. The result of this study are as follow: 1) Total amount of analyzed elemental maintenance cost was approximately 6,630,543,000won according to elemental classification system for established case study. And activities for architecture, civil, electricity, and landscape takes up about 48%, 7%, 20%, 20%, and 5% respectively. 2) Monthly payment of long-term maintenance cost for each household of case study was analyzed as about 13,114won and approximately 6,684,757,000won has been shown as total amount of accumulated long-term maintenance cost for 40 years. As a result of deviation after comparison of accumulated long-term maintenance cost and maintenance cost, accumulated long-term maintenance cost has been analyzed relatively more expensive than those of expenses of maintenance cost when the time of operation eclipse 24 years, as maximized maintenance activities executed.
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > School of Architecture and Building Science > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Altmetrics

Total Views & Downloads

BROWSE