Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

An estimation of construction and demolition debris in Seoul, Korea: Waste amount, type, and estimating model

Authors
Seo, SHwang, Y
Issue Date
Aug-1999
Publisher
AIR & WASTE MANAGEMENT ASSOC
Citation
JOURNAL OF THE AIR & WASTE MANAGEMENT ASSOCIATION, v.49, no.8, pp 980 - 985
Pages
6
Journal Title
JOURNAL OF THE AIR & WASTE MANAGEMENT ASSOCIATION
Volume
49
Number
8
Start Page
980
End Page
985
URI
https://scholarworks.bwise.kr/cau/handle/2019.sw.cau/47431
DOI
10.1080/10473289.1999.10463863
ISSN
1047-3289
Abstract
Construction and demolition (C&D) debris is generated at the site of various construction activities. However, the amount of the debris is usually so large that it is necessary to estimate the amount of C&D debris as accurately as possible for effective waste management and control in urban areas. In this paper, an effective estimation method using a statistical model was proposed. The estimation process was composed of five steps: estimation of the life span of buildings; estimation of the floor area of buildings to be constructed and demolished; calculation of individual intensity units of C&D debris; and estimation of the future C&D debris production. This method was also applied in the city of Seoul as an actual case,and the estimated amount of C&D debris in Seoul in 2021 was approximately 24 million tons. Of this total amount, 98% was generated by demolition, and the main components of debris were concrete and brick.
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > School of Civil and Environmental Engineering, Urban Design and Studies > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Altmetrics

Total Views & Downloads

BROWSE