Cut-off Effect by Rock Grouting in the Area of Dam-foundation

Authors
Hong, W.-P.Yea, G.-G.Lee, H.
Issue Date
May-2003
Keywords
Consolidation grouting; Curtain grouting; Grout pressure; Lugeon tests; Lugeon values; RQD
Citation
Proceedings of the International Offshore and Polar Engineering Conference, pp 1182 - 1186
Pages
5
Journal Title
Proceedings of the International Offshore and Polar Engineering Conference
Start Page
1182
End Page
1186
URI
https://scholarworks.bwise.kr/cau/handle/2019.sw.cau/65693
ISSN
0000-0000
Abstract
The cut-off effects of rock grouting at the dam construction sites are investigated such as RQD, unit injected cement volume, Lugeon value and maximum grout pressure in the test holes. Consolidation and curtain grouting have been carried out to obtain mainly the cut-off effect against the leakage water. Lugeon tests before and after grouting in the bedrock are performed in order to estimate the permeability improved at both pilot holes and check holes. Test results show the change of permeability before and after grouting at each site. This paper presents the relationship between Lugeon values and RQD, the relationship between Lugeon values and unit injected cement volume, and the relationship between RQD and unit injected cement volume to derive any quantifiable relationship between the two factors. Finally, at the Site 2, it showed that how average injection cement volume and average Lugeon value are affected by the injection stage of adjacent injection holes from consolidation and curtain grouting.
Files in This Item
There are no files associated with this item.
Appears in
Collections
ETC > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Altmetrics

Total Views & Downloads

BROWSE