Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

선진 CM at Risk RFP의 사례 연구 - 학교 건축물 중심으로Case Study of Advanced CM at Risk RFP - Focusing on School Buildings -

Other Titles
Case Study of Advanced CM at Risk RFP - Focusing on School Buildings -
Authors
안용한정진학한종훈
Issue Date
Apr-2017
Publisher
대한건축학회
Keywords
책임형 CM; 학교 건축물; 제안요청서; CM at Risk; School Buildings; RFP
Citation
2017 대한건축학회 학술발표대회 논문집, v.37, no.1, pp 933 - 934
Pages
2
Indexed
OTHER
Journal Title
2017 대한건축학회 학술발표대회 논문집
Volume
37
Number
1
Start Page
933
End Page
934
URI
https://scholarworks.bwise.kr/erica/handle/2021.sw.erica/10008
ISSN
2287-5786
Abstract
CM at Risk is emerging as a new ordering method. However, there is a lack of data and practices which is domestic CM at Risk projects. The purpose of this study is to analyze the RFP of the school building project in the United States, which is an advanced case of the CM at Risk. RFP provide the requisite items for respondents to carry out the task. In the CM at Risk ordering method, the additional items for evaluating the CM enterprise are added. As a result of analyzing the sample of US project, RFP requirements have a different detail items. But, they have common items that is evaluating the CM enterprise and their team members abilities.
Files in This Item
Go to Link
Appears in
Collections
COLLEGE OF ENGINEERING SCIENCES > MAJOR IN ARCHITECTURAL ENGINEERING > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Ahn, Yong Han photo

Ahn, Yong Han
ERICA 공학대학 (MAJOR IN ARCHITECTURAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE