표층처분시설 처분고의 목업테스트를 통한 채움단계별 수직도 및 이음부 벌어짐 측정Measurement of Verticality and Joint Gaps of a Near-surface Disposal Facility Vault Through a Mock-up Test for Fill-up Stages
- Other Titles
- Measurement of Verticality and Joint Gaps of a Near-surface Disposal Facility Vault Through a Mock-up Test for Fill-up Stages
- Authors
- 최동호; 안기용; 최인용; 이혁진
- Issue Date
- Dec-2021
- Publisher
- 한국건설순환자원학회
- Keywords
- 표층처분시설; 처분고; 더블월 벽체; 수직도; 이음부 벌어짐; Near-surface disposal facility; Vault; Double wall; Verticality; Joint gap
- Citation
- 한국건설순환자원학회 논문집, v.9, no.4, pp 537 - 544
- Pages
- 8
- Indexed
- KCI
- Journal Title
- 한국건설순환자원학회 논문집
- Volume
- 9
- Number
- 4
- Start Page
- 537
- End Page
- 544
- URI
- https://scholarworks.bwise.kr/erica/handle/2021.sw.erica/110437
- DOI
- 10.14190/JRCR.2021.9.4.537
- ISSN
- 2288-3320
2288-369X
- Abstract
- 표층처분시설 처분고의 채움단계를 묘사하기 위하여 목업테스트를 진행하고 채움단계에서 발생할 수 있는 구조물의 거동을조사한다. 가로 6600mm, 세로 6600mm, 두께 400mm의 현장타설 콘크리트 기초 위에 4개의 프리캐스트(PC) 코너벽체와8개의 PC 사이드벽체로 구성된 가로 5600mm, 세로 5600mm, 높이 6800mm, 두께 800mm의 철근 콘크리트 처분고를 제작한다. 처분고 안에 폐기물 드럼통을 가로 6개, 세로 6개, 총 36개로 배치한 후, 비어 있는 공간을 그라우트 채움재로 채우고양생한다. 이 과정들을 5층까지 반복하며, 채움단계별로 벽체의 수직도와 벽체 간 이음부의 벌어짐을 측정한다. 수직도는사이드벽체 한 개당 좌측과 우측에서 각각 3개씩 총 6개의 위치, 즉 4개의 사이드벽체에 대하여 총 24개의 위치에서 수평기를사용하여 측정한다. 이음부 벌어짐은 사이드벽체 한 개당 좌측, 중앙, 우측의 이음부에서 각각 3개씩 총 9개의 위치, 즉 4개의사이드벽체에 대하여 총 36개의 위치에서 균열팁을 이음부 좌우에 설치 후 버니어 캘리퍼스를 사용하여 측정한다. 목업테스트를 통해 얻은 측정된 수직도는 초기단계(ST0)를 기준으로 ±0.1°인 것으로 나타났고, 이음부 벌어짐 결과는 최대 0.38mm인것으로 나타났다. 이는 구조물에 미치는 영향이 미미한 것으로 나타났다.
In order to describe the fill-up stages of a near-surface disposal facility vault, a mock-up test is performed, and its behavior during the fil l -up stages is investigated. On an in-site concrete foundation with a l ength of 6600mm, a width of 6600mm and a thickness of 400mm, a reinforced concrete disposal vaul t is manufactured with 4 precast (PC) corner wal l s and 8 PC side wal l s. 36 wasted drums are pl aced on the 1st fl oor in 6 by 6, and then the empty space is fil l ed with grout fil l er. These processes are repeated up to the 5th floor, and the verticality and the joint gaps are measured for each fill-up stage. The verticality is measured using a level at 6 positions on each side wall (3 positions on the left and right sides, respectivel y), i.e. a total of 24 positions on the 4 side wal l s. The joint gaps are measured at 9 positions on each side wal l (3 positions on the left, center and right sides, respectively), I.e. a total 36 positions on the 4 side walls. To measure the joint gaps, crack tips are installed on the left and right sides of every joint gap, and vernier calipers are used. The measured verticality obtained through the mock-up test was found to be ±0.1° based on the initial stage (ST0), and the result of the joint gap was up to 0.38mm. This appears to have a negligible effect on the structure.
- Files in This Item
-
Go to Link
- Appears in
Collections - COLLEGE OF ENGINEERING SCIENCES > DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING > 1. Journal Articles

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.