Post-Handover Defect Risk Profile of Residential Buildings Using Loss Distribution Approach
- Authors
- Lee, Joosung; Ahn, Yonghan; Lee, Sanghyo
- Issue Date
- Jul-2020
- Publisher
- American Society of Civil Engineers
- Keywords
- Defect; Risk management; Residential buildings; Loss distribution approach (LDA); Defect risk matrix
- Citation
- Journal of Management in Engineering - ASCE, v.36, no.4, pp 1 - 9
- Pages
- 9
- Indexed
- SCIE
SCOPUS
- Journal Title
- Journal of Management in Engineering - ASCE
- Volume
- 36
- Number
- 4
- Start Page
- 1
- End Page
- 9
- URI
- https://scholarworks.bwise.kr/erica/handle/2021.sw.erica/2171
- DOI
- 10.1061/(ASCE)ME.1943-5479.0000785
- ISSN
- 0742-597X
1943-5479
- Abstract
- Managing defect risks is a highly challenging task because various defect characteristics are complexly interconnected under the multiple dimensions of various factors. It is vital to improve the efficiency of defect risk management, and major defects and defect characteristics need to be accordingly identified by closely analyzing the defect occurrence profiles. In this respect, this study constructed a defect risk matrix based on defect type, work type, and defect location, and assessed the defect risk profile of residential buildings using a loss distribution approach (LDA). The study analyzed 16,701 defect cases in 133 residential buildings that had defect disputes between 2008 and 2017 in Korea. To summarize the analysis results, in the case of structure work, the concrete cracks and damage of public locations, which are greatly affected by external environmental factors, had a high defect frequency. Furthermore, the defect types that require rework, such as incorrect installation and missing task, had a high defect severity. When the defect risk profile was examined through defect loss, the concrete cracks on the exterior walls had relatively high defect risks because they involve water problems and surface appearance. In addition, the waterproof work for underground parking lots had a very high defect risk that requires rework. This study proposes defect risk management strategies reflecting the analyzed characteristics of the defect risk profiles, to be considered in the construction, handover, post-handover, and occupancy phases. These have been derived in detail based on three risk zones: low frequency high spatial (LFHS), low frequency low spatial (LFLS), and high frequency low spatial (HFLS).
- Files in This Item
-
Go to Link
- Appears in
Collections - COLLEGE OF ENGINEERING SCIENCES > MAJOR IN BUILDING INFORMATION TECHNOLOGY > 1. Journal Articles
- COLLEGE OF ENGINEERING SCIENCES > MAJOR IN ARCHITECTURAL ENGINEERING > 1. Journal Articles

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.