Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

국내 종합병원의 리모델링의 리모델링 공사수행 전략에 관한 연구A Study on the Remodeling Construction Execution Strategy of General Hospitals in Korea

Other Titles
A Study on the Remodeling Construction Execution Strategy of General Hospitals in Korea
Authors
김하진양내원
Issue Date
Mar-2005
Publisher
한국의료복지건축학회
Keywords
종합병원; 리모델링; 공사계획; General hospital; Remodeling; Construction plan
Citation
한국의료복지시설학회지, v.11, no.1, pp.33 - 41
Indexed
KCI
OTHER
Journal Title
한국의료복지시설학회지
Volume
11
Number
1
Start Page
33
End Page
41
URI
https://scholarworks.bwise.kr/erica/handle/2021.sw.erica/46020
ISSN
19753349
Abstract
The construction can proceed in different ways according to the acquired profitability of the hospital during the construction and to the features of departments or areas. This study is an analysis of remodeling construction processes to resolve major tasks of remodeling. The remodeling strategies gained from this study can be summed up as follows: 1) Remodeling work in hospitals involves the acquire relocation of space through extensive area renovations and then moving back to the space, and lastly working on the empty space. Thus, it is more advantageous in terms of construction work to demolish the existing buildings than to acquire the relocation space through extensions or renovations. That is, demolition after the maximum utilization of the existing buildings is the most desirable in terms of space availability.2) The construction methods for remodeling are two: a method of carrying out construction by dividing the plane areas into several individual ones and of working on it floor by floor. In case of ward areas, and the outpatient area, the construction proceeds after securing the relocation space and partially setting construction areas in order to minimize the decrease in profitability due to the smaller number of beds and treatment rooms during construction. If the outpatient diagnosis/ treatment area and the supply area relocate together with the ward areas, there may be extra expenses. Thus, doing construction by area, while partially operating those areas or after relocating the whole areas.
Files in This Item
Go to Link
Appears in
Collections
COLLEGE OF ENGINEERING SCIENCES > MAJOR IN ARCHITECTURAL DESIGN STUDIES > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Yang, Nae won photo

Yang, Nae won
ERICA 공학대학 (MAJOR IN ARCHITECTURAL DESIGN STUDIES)
Read more

Altmetrics

Total Views & Downloads

BROWSE