Advanced planning and scheduling based on precedence and resource constraints for e-plant chains
- Authors
- Moon, Chiung; Kim, Jong Soo; Gen, Mistsuo
- Issue Date
- Aug-2004
- Publisher
- TAYLOR & FRANCIS LTD
- Keywords
- Production management (Manufacturing); Production scheduling; Industrial management; Production planning
- Citation
- INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.42, no.15, pp.2941 - 2954
- Indexed
- SCIE
SCOPUS
- Journal Title
- INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Volume
- 42
- Number
- 15
- Start Page
- 2941
- End Page
- 2954
- URI
- https://scholarworks.bwise.kr/erica/handle/2021.sw.erica/46566
- DOI
- 10.1080/00207540410001691956
- ISSN
- 0020-7543
- Abstract
- The e-plant chain is an extension of the integration beyond a production site by means of improved distribution management, electronic data interchange and coordination of multiple plants. The present paper proposes an advanced planning and scheduling model for the e-plant chain. The advanced planning and scheduling is the most important function when supporting flexible planning and scheduling in the e-plant chain. The problem is formulated as a mixed integer-programming model. The model includes the main features of the system including flexible operations' sequences, resource requirements and alternative schedules. Since the problem is NP-hard, an intelligent search approach based on a genetic algorithm is developed. Numerical experiments show the proposed approach is satisfactory in its accuracy and efficiency.
- Files in This Item
-
Go to Link
- Appears in
Collections - COLLEGE OF ENGINEERING SCIENCES > DEPARTMENT OF INDUSTRIAL & MANAGEMENT ENGINEERING > 1. Journal Articles
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.