Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

Advanced planning and scheduling based on precedence and resource constraints for e-plant chains

Authors
Moon, ChiungKim, Jong SooGen, Mistsuo
Issue Date
Aug-2004
Publisher
TAYLOR & FRANCIS LTD
Keywords
Production management (Manufacturing); Production scheduling; Industrial management; Production planning
Citation
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.42, no.15, pp.2941 - 2954
Indexed
SCIE
SCOPUS
Journal Title
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume
42
Number
15
Start Page
2941
End Page
2954
URI
https://scholarworks.bwise.kr/erica/handle/2021.sw.erica/46566
DOI
10.1080/00207540410001691956
ISSN
0020-7543
Abstract
The e-plant chain is an extension of the integration beyond a production site by means of improved distribution management, electronic data interchange and coordination of multiple plants. The present paper proposes an advanced planning and scheduling model for the e-plant chain. The advanced planning and scheduling is the most important function when supporting flexible planning and scheduling in the e-plant chain. The problem is formulated as a mixed integer-programming model. The model includes the main features of the system including flexible operations' sequences, resource requirements and alternative schedules. Since the problem is NP-hard, an intelligent search approach based on a genetic algorithm is developed. Numerical experiments show the proposed approach is satisfactory in its accuracy and efficiency.
Files in This Item
Go to Link
Appears in
Collections
COLLEGE OF ENGINEERING SCIENCES > DEPARTMENT OF INDUSTRIAL & MANAGEMENT ENGINEERING > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Altmetrics

Total Views & Downloads

BROWSE