Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

Benefit–Cost Analysis of Building Information Modeling (BIM) in a Railway Siteopen access

Authors
Shin, Min HoLee, Hey KyungKim, Hwan Yong
Issue Date
Nov-2018
Publisher
MDPI Open Access Publishing
Keywords
Building Information Modeling (BIM); Benefit-Cost Analysis (BCA); railway construction; liquidated damage; infrastructure; planning and design
Citation
Sustainability, v.10, no.11, pp 1 - 10
Pages
10
Indexed
SCIE
SSCI
SCOPUS
Journal Title
Sustainability
Volume
10
Number
11
Start Page
1
End Page
10
URI
https://scholarworks.bwise.kr/erica/handle/2021.sw.erica/5220
DOI
10.3390/su10114303
ISSN
2071-1050
Abstract
Recent technological improvements have made substantial changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM), open up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so on. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction. The total upfront costs required to provide a BIM for the seven projects was $116,348. On the other hand, the total costs required to fix the errors in the seven projects was $166,486. This can be regarded as the benefit of using BIM, because if BIM was implemented then the associated errors could easily be replaced. Therefore, the benefit–cost ratio can be estimated as 1.32 for one-month delay and 1.36 for a three-month delay.
Files in This Item
Go to Link
Appears in
Collections
COLLEGE OF ENGINEERING SCIENCES > MAJOR IN ARCHITECTURAL DESIGN STUDIES > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kim, Hwan Yong photo

Kim, Hwan Yong
ERICA 공학대학 (MAJOR IN ARCHITECTURAL DESIGN STUDIES)
Read more

Altmetrics

Total Views & Downloads

BROWSE