A Case Study on BIM Object-Based Earned Value and Process Management in Highway Construction
- Authors
- Kim, Yun-ok; Lee, Dong-hyuk; Park, Du-hee
- Issue Date
- Feb-2022
- Publisher
- KOREAN SOCIETY OF CIVIL ENGINEERS-KSCE
- Keywords
- BIM; WBS; CBS; Earned value management; Process management
- Citation
- KSCE JOURNAL OF CIVIL ENGINEERING, v.26, no.2, pp.522 - 538
- Indexed
- SCIE
SCOPUS
KCI
- Journal Title
- KSCE JOURNAL OF CIVIL ENGINEERING
- Volume
- 26
- Number
- 2
- Start Page
- 522
- End Page
- 538
- URI
- https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/139674
- DOI
- 10.1007/s12205-021-1348-3
- ISSN
- 1226-7988
- Abstract
- The detailed data including spatial concept is not transmitted in the detailed data including the spatial concept in the statement of internal construction sites, and the integrated management of cost and process is not carried out because the construction is carried out on the site with cost-oriented details. so doing a double task of generating the necessary work breakdown structure (WBS) and spatial concept detailed data. In order to solve these problems, in this paper, the classification of information using building information model (BIM) object-based properties, 3D object creation standards, cost, and process information are presented centering on the case of highway construction sites. In the future, BIM-based cost-process integration proposes an efficient construction management practice through management.
- Files in This Item
-
Go to Link
- Appears in
Collections - 서울 공과대학 > 서울 건설환경공학과 > 1. Journal Articles

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.