Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

A heuristic for multi-period disassembly leveling and scheduling

Authors
Kim, Dong-HoLee, Dong-Ho
Issue Date
Dec-2011
Publisher
IEEE
Citation
2011 IEEE/SICE International Symposium on System Integration, SII 2011, pp.762 - 767
Indexed
SCOPUS
Journal Title
2011 IEEE/SICE International Symposium on System Integration, SII 2011
Start Page
762
End Page
767
URI
https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/166917
DOI
10.1109/SII.2011.6147544
ISSN
0000-0000
Abstract
We consider disassembly leveling and scheduling for multiple product types with parts commonality. Disassembly leveling, one of disassembly process planning decisions, is to determine disassembly structures that specify parts and subassemblies to be obtained from used/end-of-life products, and disassembly scheduling is the problem of determining the timing and quantity of disassembling products and their subassemblies to satisfy the demands of their parts and/or subassemblies. Unlike the previous studies, we consider the two problems at the same time, especially in multi-period version for the objective of minimizing the sum of disassembly setup, disassembly operation and inventory holding costs. In particular, we consider the general case that disassembly levels may be different for products of the same type and different periods. To represent the integrated problem mathematically, an integer programming model is developed. Then, as an initial solution approach, a simple greedy heuristic using a priority rule is suggested and its performance is reported.
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 산업공학과 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Lee, Dong Ho photo

Lee, Dong Ho
COLLEGE OF ENGINEERING (DEPARTMENT OF INDUSTRIAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE