초고층 건축물의 건물 커미셔닝 프로세스 적용 및 시스템 개선방안 제안Proposal of Energy System Improvements through Building Commissioning Process of High-rise Building

Other Titles
Proposal of Energy System Improvements through Building Commissioning Process of High-rise Building
Authors
김효준조영흠류성용조현
Issue Date
2017
Publisher
한국건축친환경설비학회
Keywords
Building commissioning; Energy savings; High-rise Building; Improvement; 건물 커미셔닝; 에너지 절감; 초고층 건축물; 개선방안
Citation
한국건축친환경설비학회 논문집, v.11, no.2, pp.100 - 106
Journal Title
한국건축친환경설비학회 논문집
Volume
11
Number
2
Start Page
100
End Page
106
URI
https://scholarworks.bwise.kr/kumoh/handle/2020.sw.kumoh/1148
ISSN
1976-6483
Abstract
The purpose of this study is to show the application of building commissioning process for high-rise building in Korea. Building commissioning is an method to resolve operating problems, improve comfort, optimize energy use and identify retrofits for existing commercial and institutional buildings and central plant facilities. The case study building is a 68-story office and hotel with total floor area of 195,324 square meter. An energy audit was conducted to evaluate the indoor comfort and building energy performance. Specific building commissioning process were applied in the building. This study presents procedures, implementations and detailed descriptions of control sequence and operation comparisons for the terminal units and air handling units (AHUs), as well as the chilled water system. The study result shows 20% of energy cost saving.
Files in This Item
There are no files associated with this item.
Appears in
Collections
School of Architecture > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Ryu, Seong Ryong photo

Ryu, Seong Ryong
College of Engineering (School of Architecture)
Read more

Altmetrics

Total Views & Downloads

BROWSE