Scheduling multi-mode resource-constrained projects using heuristic rules under uncertainty environment

Authors
Abdel-Basset, MohamedSleem, AhmedAtef, AsmaaNam, YunyoungAbouhawwash, Mohamed
Issue Date
1-Jan-2021
Publisher
Tech Science Press
Keywords
Constrained resource scheduling; multi-mode durations; dynamic scheduling; resource allocation; heuristic rules
Citation
Computers, Materials and Continua, v.70, no.1, pp.847 - 874
Journal Title
Computers, Materials and Continua
Volume
70
Number
1
Start Page
847
End Page
874
URI
https://scholarworks.bwise.kr/sch/handle/2021.sw.sch/19909
DOI
10.32604/cmc.2022.017106
ISSN
1546-2218
Abstract
Project scheduling is a key objective of many models and is the proposed method for project planning and management. Project scheduling problems depend on precedence relationships and resource constraints, in addition to some other limitations for achieving a subset of goals. Project scheduling problems are dependent on many limitations, including limitations of precedence relationships, resource constraints, and some other limitations for achieving a subset of goals. Deterministic project scheduling models consider all information about the scheduling problem such as activity durations and precedence relationships information resources available and required, which are known and stable during the implementation process. The concept of deterministic project scheduling conflicts with real situations, in which in many cases, some data on the activity' s durations of the project and the degree of availability of resources change or may have different modes and strategies during the process of project implementation for dealing with multi-mode conditions surrounded by projects and their activity durations. Scheduling the multi-mode resource-constrained project problem is an optimization problem whose minimum project duration subject to the availability of resources is of particular interest to us. We use the multi-mode resource allocation and scheduling model that takes into account the dynamicity features of all parameters, that is, the scheduling process must be flexible to dynamic environment features. In this paper, we propose five priority heuristic rules for scheduling multi-mode resource-constrained projects under dynamicity features for more realistic situations, in which we apply the proposed heuristic rules (PHR) for scheduling multi-mode resource-constrained projects. Five projects are considered test problems for the PHR. The obtained results rendered by these priority rules for the test problems are compared by the results obtained from 10 well-known heuristics rules rendered for the same test problems. The results in many cases of the proposed priority rules are very promising, where they achieve better scheduling dates in many test case problems and the same results for the others. The proposed model is based on the dynamic features for project topography.
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > Department of Computer Science and Engineering > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Nam, Yun young photo

Nam, Yun young
College of Engineering (Department of Computer Science and Engineering)
Read more

Altmetrics

Total Views & Downloads

BROWSE