공공 건축공사 간접노무비 산정기준에 관한 연구Indirect Labor Cost Estimation System in the Public Building Projects

Authors
강태경박찬식
Issue Date
2004
Publisher
대한건축학회
Keywords
Estimating; Indirect Cost; Indirect Labor Cost; Regression Analysis; 적산(견적); 간접공사비; 간접노무비; 회귀분석
Citation
대한건축학회논문집 구조계, v.20, no.5, pp 121 - 128
Pages
8
Journal Title
대한건축학회논문집 구조계
Volume
20
Number
5
Start Page
121
End Page
128
URI
https://scholarworks.bwise.kr/cau/handle/2019.sw.cau/28719
ISSN
1226-9107
Abstract
Recently, the unit cost estimating system which uses previous bid costs of work items has been adopted as a new way to estimate and predict direct cost of public building construction projects in Korea. The new estimating system is not considering the direct labour cost separately. Therefore, the existing indirect labour cost estimating standard, which is based on the proportion of indirect labour cost to direct labour cost, issued by the Korea government in 1989, is facing a major change.This study presents new estimating method for indirect labour cost using regression analysis. The study also presents the proportion of direct labour cost to direct cost to apply the current indirect labour cost estimating standard.
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > ETC > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Park, Chan Sik photo

Park, Chan Sik
공과대학 (건축공학)
Read more

Altmetrics

Total Views & Downloads

BROWSE