공공 건축공사 간접노무비 산정기준에 관한 연구Indirect Labor Cost Estimation System in the Public Building Projects
- Authors
- 강태경; 박찬식
- Issue Date
- 2004
- Publisher
- 대한건축학회
- Keywords
- Estimating; Indirect Cost; Indirect Labor Cost; Regression Analysis; 적산(견적); 간접공사비; 간접노무비; 회귀분석
- Citation
- 대한건축학회논문집 구조계, v.20, no.5, pp 121 - 128
- Pages
- 8
- Journal Title
- 대한건축학회논문집 구조계
- Volume
- 20
- Number
- 5
- Start Page
- 121
- End Page
- 128
- URI
- https://scholarworks.bwise.kr/cau/handle/2019.sw.cau/28719
- ISSN
- 1226-9107
- Abstract
- Recently, the unit cost estimating system which uses previous bid costs of work items has been adopted as a new way to estimate and predict direct cost of public building construction projects in Korea. The new estimating system is not considering the direct labour cost separately. Therefore, the existing indirect labour cost estimating standard, which is based on the proportion of indirect labour cost to direct labour cost, issued by the Korea government in 1989, is facing a major change.This study presents new estimating method for indirect labour cost using regression analysis. The study also presents the proportion of direct labour cost to direct cost to apply the current indirect labour cost estimating standard.
- Files in This Item
- There are no files associated with this item.
- Appears in
Collections - College of Engineering > ETC > 1. Journal Articles
![qrcode](https://api.qrserver.com/v1/create-qr-code/?size=55x55&data=https://scholarworks.bwise.kr/cau/handle/2019.sw.cau/28719)
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.