A study on the transformer spare capacity in the existing apartments for the future growth of electric vehicles
- Authors
- Choi, J.; Kim, S.-Y.; Lee, J.
- Issue Date
- Dec-2016
- Publisher
- 대한전기학회
- Keywords
- Electric vehicle; Existing apartment; Limit point; Transformer spare capacity
- Citation
- 전기학회논문지, v.65, no.12, pp 1949 - 1957
- Pages
- 9
- Indexed
- SCOPUS
KCI
- Journal Title
- 전기학회논문지
- Volume
- 65
- Number
- 12
- Start Page
- 1949
- End Page
- 1957
- URI
- https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/153406
- DOI
- 10.5370/KIEE.2016.65.12.1949
- ISSN
- 1975-8359
2287-4364
- Abstract
- Rapid Expansion of EVs(Electric Vehicles) is inevitable trends, to comply with eco-friendly energy paradigm according to Paris Agreement and to solve the environment problems such as global warming. In this paper, we analyze the limit point of transformer acceptable capacity as the increase of power demand considering EVs supply in the near future. Through the analysis of transformer utilization, we suggest methods to analyze the spare capacity of transformer for the case of optimal efficiency operation and emergency operation respectively. We have the results of 18.4∼29% spare capacity for the charging infrastructure to the rated capacity of transformer by analyzing the existing sample apartments. It is analyzed that the acceptable number of EVs is 0.09∼0.14 for optimal efficiency operation and 0.06∼0.13 for emergency operation. Therefore, it is analyzed the power demand of EV will exceed the existing transformer spare capacity in 7∼8 years as the annual growth rate of EVs is prospected 112.5% considering current annual growth rate of EVs and the government EV supply policy. Copyright © 2016 The Korean Institute of Electrical Engineers.
- Files in This Item
- There are no files associated with this item.
- Appears in
Collections - 서울 공과대학 > 서울 전기공학전공 > 1. Journal Articles

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.