Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

선택적 돌연변이 제어를 통한 고밀도 공정로봇의 효율적 용접점 분배Efficient scheduling problem for Multi-robot system via Controlled mutation of GA

Other Titles
Efficient scheduling problem for Multi-robot system via Controlled mutation of GA
Authors
임성수김제석박장현김정민범진환
Issue Date
May-2014
Publisher
제어로봇시스템학회
Keywords
High-density robot; Genetic algorithm; Controlled mutation; Local improvement
Citation
2014 제29회 ICROS 학술대회, pp.374 - 375
Indexed
OTHER
Journal Title
2014 제29회 ICROS 학술대회
Start Page
374
End Page
375
URI
https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/159904
Abstract
In this paper, we present and solve a scheduling problem for a high-density robotic workcell under various working conditions. The genetic algorithm (GA) is employed to optimize tasks for scheduling of the multi-robot system. A new operation method for generating subsequent generations of GA, controlled mutation is introduced depending on the value of the objective function in order to help the algorithm get out of the local minimum. Several simulation graphs verify efficiency of the proposed algorithm.
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 미래자동차공학과 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Park, Jahng Hyon photo

Park, Jahng Hyon
COLLEGE OF ENGINEERING (DEPARTMENT OF AUTOMOTIVE ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE